BUILDING DIMENSIONS
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.
709180306
Model No. BW54-A BWG54 BWW54
YL54 YL54M
Owner's Manual & Assembly Instructions
BI01
Exterior Dimensions Interior Dimensions Door
*Approx. Foundation Storage Area (Roof Edge to Roof Edge) (Wall to Wall) Opening
Size Size Sq. Ft. Cu. Ft. Width Depth Height Width Depth Height Width Height
5' x 4' 57" x 45 7/8" 16 93 59 1/2" 48" 70 3/4" 54 1/4" 43 1/8" 69 1/2" 22 1/4" 65"
1,4m x 1,1m 145cm x 117cm 1,5m
2
2,6m
3
151cm 122cm 180cm 138cm 110cm 177cm 57cm 165cm
Vue de la page 0
1 2 3 4 5 6 ... 23 24

Résumé du contenu

Page 1 - YL54 YL54M

* Size rounded off to the nearest footBUILDING DIMENSIONSCAUTION: SOME PARTS HAVE SHARP EDGES. CAREMUST BE TAKEN WHEN HANDLING THE VARIOUS PIECESTO AV

Page 2 - BEFORE YOU BEGIN

It is important that the entire floor frame be anchored after the building is erected.Below are recommended ways of anchoring. Anchoring Down The Buil

Page 3 - PLAN AHEAD

11Remove from bag of screwsand save for the last step66029Plug (1)(Packed with Screws)7972Door Handle Lock Bracket (1)66382Lower Door Guide (2)66242D

Page 4 - SAFETY FIRST

Parts List BI1212Assembly Part Part Quantity CheckKey No. Number Description in Carton List 1 3719 Door Handle Brace 1 2 6300

Page 5 - CARE & MAINTENANCE

13Assembly by Key No. BI13

Page 6 - ACCESSORIES

The door track/header assembly sup-ports the sliding door and reinforcesthe front wall. It is made up of twopieces.1 Using the door track, with small

Page 7

1 Assemble the four corners of thefloor frame using two screws at eachcorner as shown. At the front cornersfasten bolts through from the bottomwith nu

Page 8

1 Position rear corner panels at thecorners of the floor frame as shown.The widest part of each corner panelmust be placed along side of the build-ing

Page 9 - Foundation

17●●●●● 7461 Rear Wall Angle (1)●●●●● 9918 Rear Wall Channel (1)●●●●● 9919 Side Wall Channel (2)● Parts Needed For ●FramesStep 4The main frame pieces

Page 10 - Anchoring

18●●●●● 9456 Front Wall Panel (1)●●●●● Door Track Assembly (1)●●●●● 9698 Door Jamb (1)●●●●● 9370 Door Jamb (1)●●●●● 6627 Wall Panel (1)● Parts Needed

Page 11 - Hardware

19●●●●● 7532 Right Gable (1)●●●●● 7533 Left Gable (1)●●●●● 7660 Roof Beam (1)● Parts Needed For ●Gables/Roof BeamStep 61 Lift and fasten a right and l

Page 12 - Parts List

2Owner's ManualBefore beginning construction, check local building codes regarding footings, locationand other requirements. Study and understand

Page 13 - Assembly by Key No

20●●●●● 7464 Right Roof Panel (1)●●●●● 7465 Left Roof Panel (1)● Parts Needed For ●Roof AssemblyStep 7Installing the roof panels is best donewith a st

Page 14 - Door Track/Header Assembly

21●●●●● 7534 Roof Trim (2)● Parts Needed For ●Roof TrimStep 81 Attach the roof trim to the ends ofthe roof panels on each side of thebuilding using sc

Page 15 - Floor Frame

22●●●●● 3719 Door Handle Brace (1)●●●●● 7377 Door (1)●●●●● 7200 Horizontal Door Brace (2)●●●●● 6300 Vertical Door Brace (1)● Parts Needed For ●Door As

Page 16 - ● Parts Needed For ●

23●●●●● Door Assembly (1)●●●●● 7972 Door Handle Lock Bracket (1)● Parts Needed For ●Door Installation & AdjustmentStep 101 From inside

Page 17

SOME FACTS ABOUT RUSTRusting is a natural oxidizing process that occurswhen bare metal is exposed to moisture. Problemareas include screw holes, unfin

Page 18 - 7/8" Screw

3Selecting and Preparing Your Site: Before assembly, you will want to decide ona location for your building. The best location is a level area with go

Page 19 - Gables/Roof Beam

4Safety precautions are important to follow throughout the construction of your building.•Care must be taken when handling variouspieces of your build

Page 20 - Roof Assembly

Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immedia

Page 21 - Roof Trim

6ACCESSORIES... A6 WEB* Some drilling required to fit buildings without mid-wall bracing.Model No. SS404• Makes 8" to 12" (20-30cm)

Page 22 - Door Brace

THIS PAGEWASLEFTBLANKINTENTIONALLY7

Page 23 - Along Its Length

THIS PAGEWASLEFTBLANKINTENTIONALLY8

Page 24 - YL54 YL54M

The Foundation For Your Building9FRONT(DOOR)FRONT(DOOR)Foundation BI09Note: Finished Slab dimensions, with lumber removed.OPTION 1: ARROW FLOOR