* Size rounded off to the nearest footBUILDING DIMENSIONSCAUTION: SOME PARTS HAVE SHARP EDGES. CAREMUST BE TAKEN WHEN HANDLING THE VARIOUS PIECESTO AV
It is important that the entire floor frame be anchored after the building is erected.Below are recommended ways of anchoring. Anchoring Down The Buil
11Remove from bag of screwsand save for the last step66029Plug (1)(Packed with Screws)7972Door Handle Lock Bracket (1)66382Lower Door Guide (2)66242D
Parts List BI1212Assembly Part Part Quantity CheckKey No. Number Description in Carton List 1 3719 Door Handle Brace 1 2 6300
13Assembly by Key No. BI13
The door track/header assembly sup-ports the sliding door and reinforcesthe front wall. It is made up of twopieces.1 Using the door track, with small
1 Assemble the four corners of thefloor frame using two screws at eachcorner as shown. At the front cornersfasten bolts through from the bottomwith nu
1 Position rear corner panels at thecorners of the floor frame as shown.The widest part of each corner panelmust be placed along side of the build-ing
17●●●●● 7461 Rear Wall Angle (1)●●●●● 9918 Rear Wall Channel (1)●●●●● 9919 Side Wall Channel (2)● Parts Needed For ●FramesStep 4The main frame pieces
18●●●●● 9456 Front Wall Panel (1)●●●●● Door Track Assembly (1)●●●●● 9698 Door Jamb (1)●●●●● 9370 Door Jamb (1)●●●●● 6627 Wall Panel (1)● Parts Needed
19●●●●● 7532 Right Gable (1)●●●●● 7533 Left Gable (1)●●●●● 7660 Roof Beam (1)● Parts Needed For ●Gables/Roof BeamStep 61 Lift and fasten a right and l
2Owner's ManualBefore beginning construction, check local building codes regarding footings, locationand other requirements. Study and understand
20●●●●● 7464 Right Roof Panel (1)●●●●● 7465 Left Roof Panel (1)● Parts Needed For ●Roof AssemblyStep 7Installing the roof panels is best donewith a st
21●●●●● 7534 Roof Trim (2)● Parts Needed For ●Roof TrimStep 81 Attach the roof trim to the ends ofthe roof panels on each side of thebuilding using sc
22●●●●● 3719 Door Handle Brace (1)●●●●● 7377 Door (1)●●●●● 7200 Horizontal Door Brace (2)●●●●● 6300 Vertical Door Brace (1)● Parts Needed For ●Door As
23●●●●● Door Assembly (1)●●●●● 7972 Door Handle Lock Bracket (1)● Parts Needed For ●Door Installation & AdjustmentStep 101 From inside
SOME FACTS ABOUT RUSTRusting is a natural oxidizing process that occurswhen bare metal is exposed to moisture. Problemareas include screw holes, unfin
3Selecting and Preparing Your Site: Before assembly, you will want to decide ona location for your building. The best location is a level area with go
4Safety precautions are important to follow throughout the construction of your building.•Care must be taken when handling variouspieces of your build
Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immedia
6ACCESSORIES... A6 WEB* Some drilling required to fit buildings without mid-wall bracing.Model No. SS404• Makes 8" to 12" (20-30cm)
THIS PAGEWASLEFTBLANKINTENTIONALLY7
THIS PAGEWASLEFTBLANKINTENTIONALLY8
The Foundation For Your Building9FRONT(DOOR)FRONT(DOOR)Foundation BI09Note: Finished Slab dimensions, with lumber removed.OPTION 1: ARROW FLOOR
Commentaires sur ces manuels